LEED-AP-BD-C TESTING CENTER & VCE LEED-AP-BD-C TORRENT

LEED-AP-BD-C Testing Center & Vce LEED-AP-BD-C Torrent

LEED-AP-BD-C Testing Center & Vce LEED-AP-BD-C Torrent

Blog Article

Tags: LEED-AP-BD-C Testing Center, Vce LEED-AP-BD-C Torrent, New LEED-AP-BD-C Exam Fee, LEED-AP-BD-C Standard Answers, Latest LEED-AP-BD-C Exam Pdf

DOWNLOAD the newest 2Pass4sure LEED-AP-BD-C PDF dumps from Cloud Storage for free: https://drive.google.com/open?id=1AKfFT61npSt3z5BzX1L6Mxh2dF3JQKVD

This LEED-AP-BD-C certification assists you to put your career on the right track and helps you to achieve your career goals in a short time period. There are several personal and professional benefits that you can gain after passing the LEED AP Building Design + Construction (LEED AP BD+C) (LEED-AP-BD-C) certification exam. The prominent LEED-AP-BD-C certification benefits include validation of skills and knowledge, more career opportunities, instant rise in salary, quick promotion, etc.

USGBC LEED-AP-BD-C Exam Syllabus Topics:

TopicDetails
Topic 1
  • Energy and Atmosphere: In this topic, LEED Green Associates focuses on building reuse, including historic building renovations. It covers material reuse strategies, enclosure materials, and permanently installed interior components into new designs.
Topic 2
  • LEED Process: This topic tests the skills of LEED Green Associates involved in green building initiatives. It focuses on various methods to achieve LEED goals, such as developing credit interpretation rulings and utilizing Regional Priority Credits to explore synergies within the LEED system.
Topic 3
  • Water Efficiency: This topic measures the skills of LEED Green Associates in optimizing water use in building projects. It explores strategies for reducing outdoor water use through efficient irrigation practices, including landscape water requirements and irrigation systems. It also covers using native and adaptive plant species to minimize irrigation demands.
Topic 4
  • Integrative Strategies: It emphasizes the importance of an integrative process. The topic also covers their knowledge about the value of teamwork in developing integrative green strategies and how they can collaborate throughout different project phases.
Topic 5
  • Project Surroundings and Public Outreach: LEED Green Associates learn about promoting sustainable practices, regional design considerations that incorporate green construction measures, cultural awareness issues related to historic or heritage impacts, and ensuring that sustainability efforts are respectful of local values.
Topic 6
  • Location and Transportation: This topic measures the skills of LEED Green Associates in sustainable development. It addresses critical factors in site selection, including development constraints and opportunities related to environmental considerations, and community connectivity concepts, such as walkability and street design, which are vital for promoting sustainable transportation options.
Topic 7
  • Building Loads: This topic is focused on optimizing building performances through effective load management. It addresses design considerations such as building orientation and glazing selection while clarifying regional factors that influence these decisions.
Topic 8
  • Sustainable Sites: It covers site assessment and planning that involves evaluating various site characteristics, such as topography, hydrology, climate, vegetation, and soil conditions. It also covers assessing a site’s potential as a resource for energy flows while addressing construction activity pollution prevention measures.

>> LEED-AP-BD-C Testing Center <<

Vce LEED-AP-BD-C Torrent - New LEED-AP-BD-C Exam Fee

The clients only need 20-30 hours to learn the LEED-AP-BD-C exam questions and prepare for the test. Many people may complain that we have to prepare for the LEED-AP-BD-C test but on the other side they have to spend most of their time on their most important things such as their jobs, learning and families. But if you buy our LEED-AP-BD-C Study Guide you can both do your most important thing well and pass the LEED-AP-BD-C test easily because the preparation for the test costs you little time and energy.

USGBC LEED AP Building Design + Construction (LEED AP BD+C) Sample Questions (Q293-Q298):

NEW QUESTION # 293
What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

  • A. Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided
  • B. Retail projects must conduct a waste stream audit once a month for the project in an existing or rented location or make projections based on data gathered from a previous cycle. Identify the top-three recyclable waste streams while stating the top-two waste streams where both collection and storage space will be provided
  • C. Retail projects must conduct a waste stream audit for the once a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top- four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided
  • D. Retail projects must conduct a waste stream audit twice a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

Answer: A

Explanation:
Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided.
This is the requirement for Retail projects under the Materials and Resources Prerequisite, Storage and Collection of Recyclables, according to the LEED v4 BD+C Reference Guide1. The purpose of this prerequisite is to facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills1. The prerequisite applies to all LEED BD+C projects, but Retail projects have a different approach than other project types because of their unique waste streams and operational characteristics1. Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. The audit or projection must identify the top-five recyclable waste streams by weight or volume using consistent metrics throughout1. The waste stream study period must be a minimum of 24 hours1. Retail projects must also provide dedicated areas that serve the entire building and are accessible to waste haulers and building occupants for the collection and storage of materials for recycling for at least four of the top-five recyclable waste streams identified by the audit or projection1. References:
* Prerequisite: Storage and collection of recyclables | U.S. Green Building Council


NEW QUESTION # 294
What requirements are needed to earn Regional Priority credits?

  • A. Exemplary performance
  • B. Points are awarded automatically
  • C. Full name and specialty credential of LEED AP
  • D. Related credits registration

Answer: D

Explanation:
Regional Priority (RP) credits are awarded based on local environmental concerns.
* Projects must register for credits that align with local sustainability priorities.
* Points are NOT automatic-projects must achieve the related credits.
(Source: Official LEED BD+C Reference Manual)


NEW QUESTION # 295
What is the best strategy for a LEED AP to suggest in order to quantify the impact of increasing the window- to-wall ratio on a Building Design and Construction project?

  • A. Review Green Business Certification Inc. (GBCI)'s comments on the energy model submission
  • B. Perform a simple box energy model before the completion of the schematic phase
  • C. Compare the current project to other similar projects
  • D. Monitor the HVAC loads throughout the life of the project

Answer: B

Explanation:
This option allows the project team to evaluate the impact of different window-to-wall ratios on the energy performance of the building, and to optimize the design accordingly. A simple box energy model is a preliminary analysis tool that can be used to compare different design alternatives and inform decision making in the early stages of the project12.
References: = [LEED v4: Building Design + Construction Guide], LEED v4 for Building Design and Construction: Energy and Atmosphere, The impacts of window to wall ratio and window orientation on building energy consumption and CO2 emissions under climate change. Message has links.


NEW QUESTION # 296
What is the basis of energy consumption in determining the percentage of green power or carbon offsets?

  • A. Performance
  • B. Quantity
  • C. Efficiency
  • D. Quality

Answer: B

Explanation:
The basis of energy consumption in determining the percentage of green power or carbon offsets is the quantity of energy used by the project, measured in kilowatt-hours (kWh) or British thermal units (Btu). Green power is electricity generated from renewable sources, such as solar, wind, hydro, biomass, or geothermal. Carbon offsets are reductions or removals of greenhouse gas emissions from a project or activity that compensates for the emissions from another source. According to the LEED Reference Guide for Building Design and Construction1, the Energy and Atmosphere Credit, Green Power and Carbon Offsets, requires the project to engage in a contract for qualified resources that meet the following requirements:
The contract term is at least five years.
The green power or carbon offsets are based on the quantity of energy consumed by the building.
The green power is Green-e Energy certified or the equivalent.
The carbon offsets are Green-e Climate certified, Verified Carbon Standard certified, Gold Standard certified, or the equivalent.
Reference:
LEED Reference Guide for Building Design and Construction v4
Green Power and Carbon Offsets | U.S. Green Building Council
Green Power and Carbon Offsets - LEEDuser
Green Power and Carbon Offsets - LEED v4 for BD+C: New Construction ...


NEW QUESTION # 297
A project has total waste of 20 tons (18.1 tonnes) that includes the following:
8 tons (7.3 tonnes) of recycled demolition steel and concrete
2 tons (1.8 tonnes) of trees cleared from the site
. 3 tons (2.7 tonnes) of commingled scrap with 40% diverted
. 6 tons (5.4 tonnes) of used furniture donated to a non-profit organization
1 ton (0.9 tonnes) of removed carpet and ceiling tiles sent back to the manufacturer What is the percentage of diverted waste for Materials and Resources Credit, Construction and Demolition Waste Management?

  • A. 75%
  • B. 60%
  • C. 100%
  • D. 90%

Answer: A

Explanation:
The percentage of diverted waste for Materials and Resources Credit, Construction and Demolition Waste Management is calculated by dividing the total weight of diverted materials by the total weight of waste generated1. Diverted materials are those that are reused, recycled, salvaged, or donated2. In this case, the total weight of diverted materials is:
* 8 tons (7.3 tonnes) of recycled demolition steel and concrete
* 6 tons (5.4 tonnes) of used furniture donated to a non-profit organization
* 1 ton (0.9 tonnes) of removed carpet and ceiling tiles sent back to the manufacturer
* 40% of 3 tons (2.7 tonnes) of commingled scrap, which is 1.2 tons (1.1 tonnes) The sum of these weights is 16.2 tons (14.7 tonnes). The total weight of waste generated is 20 tons (18.1 tonnes). Therefore, the percentage of diverted waste is:
(16.2 / 20) x 100 = 81%
However, the credit allows for a 10% adjustment for vegetative waste, which is not considered a building material3. Therefore, the percentage of diverted waste after adjustment is:
(81 - 10) = 71%
The closest answer option to this value is B. 75%.


NEW QUESTION # 298
......

They work closely and check all LEED-AP-BD-C exam practice test questions step by step and ensure the top standard of LEED-AP-BD-C exam questions all the time. So rest assured that with the LEED-AP-BD-C Exam Dumps you will get everything that you need to prepare and pass the USGBC LEED-AP-BD-C certification exam with good scores.

Vce LEED-AP-BD-C Torrent: https://www.2pass4sure.com/USGBC-LEED/LEED-AP-BD-C-actual-exam-braindumps.html

2025 Latest 2Pass4sure LEED-AP-BD-C PDF Dumps and LEED-AP-BD-C Exam Engine Free Share: https://drive.google.com/open?id=1AKfFT61npSt3z5BzX1L6Mxh2dF3JQKVD

Report this page